Close
You have no items in your shopping cart.

Com-Power PC-114 EMC Pre-Compliance Emissions Test System

Manufacturer part number: PC-114
9 KHz - 1 GHz. Perform Radiated & Conducted EMI pre-compliance testing at your facility up to 1 GHz.
PURCHASE
AvailableQTYPrice
New:   1
+ -
$13,340.00
Used:   0
+ -
$0.00Configurations
X

Available Configurations

Key Features and Functions

Com-Power PC-114 EMI emissions test system is a ideal solution performing pre-compliance EMC testing from 9 kHz - 1 GHz.

It has essential equipment needed for radiated and conducted EMI emissions measurements. The system includes a spectrum analyzer, antennas, near field probes, a preamplifier, LISN and a non conductive antenna tripod. Pre-compliance testing in EMC is a commonly used term not easy to define. In general, it implies testing done prior to formal testing for legal compliance. Formal legal compliance is performed at a facility designed and equipped with test instrumentation that is fully compliant with the applicable EMC standards.

Pre-compliance testing is specially useful for specifications such as FCC, Part 15, EN 55022 or EN 55011 (CISPR 22 or CISPR11). Pre-compliance testing usually means using the full compliance methods but making a few educated compromises in use of site or equipment to reduce costs and testing time.

  • Reference Signals
  • Radiated & Conducted
  • Portable
  • Battery Operated
  • SPA-815TGE: Spectrum Analyzer 9 kHz to 1.5 GHz with tracking gen & EMI option
  • AB-900: Biconical Antenna 25 MHz - 300 MHz
  • AL-100: Log Periodic Antenna 300 MHz to 1 GHz
  • PS-400: Near Field Probe Set 2 E-Field Probes and 1 H-Field Probe
  • CGO-501 or CGO-505: Comb Generator for site verification
  • PAM-103: Preamplifier 32 dB Gain 1 MHz to 1 GHz
  • LIN-120A: Line Impedance Stabilization Network, 150 kHz to 30 MHz, 20 Amp.
  • AT-812: Antenna Tripod 0.8 meter to 1.2 meter adjustable height
  • Biconical Antenna, 30MHz-300MHz
  • Log Periodic Antenna, 30MHz-1GHz
  • Non-Condictive Antenna Tripod
  • Comb Generator
  • Line Impedance Stabilization Network, 150kHz-30MHz
  • Transient Limiter
  • Preamp, 32dB gain, 1-1000MHz
Description

Key Features and Functions

Com-Power PC-114 EMI emissions test system is a ideal solution performing pre-compliance EMC testing from 9 kHz - 1 GHz.

It has essential equipment needed for radiated and conducted EMI emissions measurements. The system includes a spectrum analyzer, antennas, near field probes, a preamplifier, LISN and a non conductive antenna tripod. Pre-compliance testing in EMC is a commonly used term not easy to define. In general, it implies testing done prior to formal testing for legal compliance. Formal legal compliance is performed at a facility designed and equipped with test instrumentation that is fully compliant with the applicable EMC standards.

Pre-compliance testing is specially useful for specifications such as FCC, Part 15, EN 55022 or EN 55011 (CISPR 22 or CISPR11). Pre-compliance testing usually means using the full compliance methods but making a few educated compromises in use of site or equipment to reduce costs and testing time.

  • Reference Signals
  • Radiated & Conducted
  • Portable
  • Battery Operated